Skip to content
Time to Signal

Home  /  All notes

Running a programme

The first ninety days without a purchase, the ranking that returns most soonest, and the failures that recur — each visible early and each with a specific correction.

8 notes

Starting a Programme

The first ninety days, without a purchase. What to measure, what to fix first, and the order that produces credibility.

Procedure

Choosing What to Fix

A list of forty findings and one person. The ranking that gets the most back soonest, and the trap of doing the interesting one first.

Procedure

Who Owns the Toolchain

Nobody, one person, or a team. Each arrangement fails differently, and the failure modes are predictable enough to plan around.

Analysis

Buying, Building and Configuring

Most of the available gains come from configuration you already own. What a product genuinely adds, and when building your own is defensible.

Analysis

Getting Improvements Adopted

A faster path nobody uses is not faster. Why developers keep the old way, and what actually moves people across.

Analysis

Stopping It Coming Back

Build performance decays continuously. The checks that catch a regression while it is still attributable to one commit.

Procedure